BUS BAR RETROFITTING ‐ OVERHEATING & FLASH PROBLEMS

  • Thermography of Bus Bars
  • Load Flow study of Existing system
  • Suggestion & Recommendation of suitable solution
  • Supply & Installation of Bus Bars
  • Monitoring of system for effective performance

RELAY RETROFITTING

  • Study of Existing Protection System
  • Reccommendation of technically suitable Relay
  • Supply of all required material
  • Supply, Installation, Testing, Parameterization of Relay
  • Final Commissioning of Relay & Charging of Panel

BREAKER RETROFITTING SERVICES REPLACING OLD BREAKER BY NEW

  • Site Survey and Study of Existing system.
  • Provide recommendation for suitable rating of Breaker as per the Load demand.
  • Supply of Retrofitting Kit along with the Breaker.
  • Removal of Existing system and Installation of New ACB along with other Components with wiring modification.
  • Busbar, Door and Compartment Fabrication and Painting work.
  • Scheme checking, Feeder/Breaker Testing and Commissioning of System.